Remember to place your order prior to the deadline date in order to receive the
advance order rates.
|
|
For those exhibitors with equipment requiring cord caps or high voltage
connections, have your equipment “pre-wired” to match Edlen’s distribution
system.
|
Equipment Power Requirement
5 amps -15 amps of 120 volt power
20 amps 120 volt power
5 amps - 30 amps 208-volt single or three phase
60 -100 amps 208-volt single or three phase
|
Edlen Plug Configuration
NEMA 5-15P 2 pole 3 wire grounded
NEMA 5-20P 2 pole 3 wire grounded
NEMA L21-30P
60-150 Amp Inline Camlock (male)
|
|
|
When determining your electrical requirements do not rely on your past orders.
Make sure to look at all the rating plates on your equipment or speak to one of
your technicians so that you do not order more power than is necessary. Or
simply contact any Edlen office for assistance in determining your power needs. |
|
Expedite your move-in by allowing Edlen to distribute your power on the floor
prior to your arrival at show site. You can do this by authorizing Edlen to
proceed without supervision. Simply complete our labor order form and send a
scaled floor plan that indicates booth orientation, exact outlet locations and
one main power location from which to distribute your power.
|
|
When you request an electrician to work in your booth and your supervision is
required or requested, please make sure a representative is available to
supervise the electrician. If no supervision is available and the electrician
returns to the labor desk, there is a minimum 1/2-hour labor charge per
electrician requested.
|
|
Exhibitors can plug their own 120-volt equipment into the outlets they order.
Labor is not required to do this.
|
|
Exhibitors who require network cables run on the floor along with their
electric, should send their cables properly marked with company name, contact &
booth number to Edlen’s office at the address on the show's order form. This
will allow our electricians to lay the cable at the same time we are laying the
electrical.
|
|
Installation labor is billed in 1 hour increaments. Dismantle labor is charged
in 1/2 hour increments or 1/2 the total installation time.
|
|
Many convention centers require the electrical contractor to turn off the power
each night starting 30 minutes after the close of show. The electrical is then
turned back on in the morning no later than 30 minutes prior to the opening of
the show. Please order 24-hour power if you require your power to remain on
after the show closes.
|